NOTE: The Letter of Approval from the Transit Authority (if applicable) does not have to be submitted with the original application. Four copies of the completed CD12, Designation of a Site Safety Coordinator.Four copies of the completed CD7, Notification of Raising/Lowering a Tower Crane.In addition, Tower Crane applications must include: One copy of the Letter of Evacuation, only if the load lifted passes over an occupied building.One copy of the signed and sealed calculations (for all cranes and configurations submitted).One copy of the signed and sealed engineer’s letter.One copy of the Community Board Notification.Four copies of the Technical Report (Form 10F/ CD8), if applicable.Four copies of the signed, fully completed CD4 Form.One original signed copy of the fully completed CD4 Form.NOTE: Only Completed Cranes Notices (CN) will be Accepted for Review Poolįor a Cranes Notice (CN) application to be reviewed as quickly as possible, include the following:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |